Kottayam Today
Saturday, 24 October 2026Local news from Kottayam district

Kakkanad Flyover: Pile Load Capacity Test to Begin on the 28th

Kakkanad Flyover: Pile Load Capacity Test to Begin on the 28th
Image: Mathrubhumi

The pile load capacity test for the Kakkanad flyover is scheduled to begin on the 28th.

Originally reported by Mathrubhumi Summarised from the source’s public news feed without altering the facts. Read the original report for the full story.